Camo Military Backpack
Specifications
| Shell | Oxford |
|---|---|
| Capacity | 45 L |
| MOLLE | Webbing rows |
| Carry | Padded harness |
| Colours | Tan, Black, Olive |
| Hydration | Hydration compatible |
| Place of Origin | Guangzhou, Guangdong, China |
| MOQ | 300 pcs per colour (stock colours from 1 pc) |
| Sample Lead Time | 7–14 days |
| Bulk Lead Time | 30–45 days after sample approval |
Construction & Materials
The body is cut from Oxford, with Webbing rows positioned before the side seams are closed. The covered main opening is set into a reinforced opening, and the base, handle and strap anchors are bar-tacked. Internal seams are bound. Hardware is selected by load, and the grade is recorded on the construction sheet. The sample is loaded and checked for stitch pull and hardware wear before the specification is approved. A pre-production sample is also checked for strap pull and hardware wear before bulk is released. Binding tape and thread are colour-matched to the shell.
Capacity & Load
The 45 L main compartment is laid out for patrol, range and travel loads. The covered main opening gives a wide opening for packing, and the internal layout keeps heavy items against the back. Padded harness transfers the load to the shoulders and waist, with compression straps taking up slack when the pack is part-loaded. The main opening is sized so a packed layer goes in without forcing the zip. The layout is checked with the intended load, not an empty shell, so pressure points show up before bulk. Compression straps take up slack when the pack is part-loaded, and the base is reinforced for setting down.
Customisation Options
For the Camo Military Backpack, the Oxford can move to a heavier or lighter grade, colour can be matched to a Pantone reference, and the logo can be embroidery, PVC patch or printed label. Pocket layout is open to change; the harness geometry and MOLLE spacing stays fixed. MOQ 300 pcs per colour, samples in 7–14 days. For the Camo Military Backpack, colour matching is to a Pantone reference or a physical swatch, logo placement is confirmed on the sample, and bulk is scheduled 30–45 days after approval. A repeat order uses the same construction sheet, so the second run matches the first.
Made in our Shiling workshop
Production of the Camo Military Backpack stays in Huadu: the shell is cut and the MOLLE panel is stitched. Next, the logo and colour are checked against the approved sample. Inspectors check colour and logo placement on the first carton. The workshop covers 4,000 m2 and runs 100 staff and 205 machines. Cartons are packed against the order sheet and photographed before dispatch. Photographs of the first carton and the packed pallet are sent before the balance is released for shipping. The order is packed against the approved carton marking and shipping marks.
Send quantity, shell weight and logo placement. Reina replies within 24 hours with pricing and sampling options.