MOLLE Backpack
Specifications
| Shell | Polyester (1000D option) |
|---|---|
| Capacity | 45 L |
| MOLLE | Webbing rows + loop field |
| Carry | Padded back panel and shoulder straps |
| Colours | Green, Tan, Black, CP camo |
| Modules | 4-in-1: backpack, duffel, shoulder bag |
| Place of Origin | Guangzhou, Guangdong, China |
| MOQ | 300 pcs per colour (stock colours from 1 pc) |
| Sample Lead Time | 7–14 days |
| Bulk Lead Time | 30–45 days after sample approval |
Construction & Materials
The body is cut from Polyester (1000D option), with Webbing rows + loop field positioned before the side seams are closed. The covered main opening is set into a reinforced opening, and the base, handle and strap anchors are bar-tacked. Internal seams are bound. Hardware is selected by load, and the grade is recorded on the construction sheet. The sample is loaded and checked for stitch pull and hardware wear before the specification is approved. A pre-production sample is also checked for strap pull and hardware wear before bulk is released. Binding tape and thread are colour-matched to the shell.
Capacity & Load
At 45 L, the pack is sized for patrol, range and travel use. The main compartment opens through covered main opening, with smaller items in the front and side pockets. Padded back panel and shoulder straps sets the carry height, and the load sits close to the body rather than hanging away. Compression straps take up slack when the pack is part-loaded. Pouches and attachments are positioned so the heaviest items sit closest to the body. Compression straps take up slack when the pack is part-loaded, and the base is reinforced for setting down.
Customisation Options
For the MOLLE Backpack, the Polyester (1000D option) can move to a heavier or lighter grade, colour can be matched to a Pantone reference, and the logo can be embroidery, PVC patch or printed label. Pocket layout is open to change; the harness geometry and MOLLE spacing stays fixed. MOQ 300 pcs per colour, samples in 7–14 days. For the MOLLE Backpack, colour matching is to a Pantone reference or a physical swatch, logo placement is confirmed on the sample, and bulk is scheduled 30–45 days after approval. A repeat order uses the same construction sheet, so the second run matches the first.
Made in our Shiling workshop
In the Shiling workshop, the main body is assembled before the lining is bound in. Then the logo and colour are checked against the approved sample. The MOLLE Backpack is checked against the sealed sample for colour and logo placement. The site runs 4,000 m2 with 100 staff and 205 machines. The same team cuts, sews and inspects the order, so a change is caught before the goods leave the floor. Photographs of the first carton and the packed pallet are sent before the balance is released for shipping. The order is packed against the approved carton marking and shipping marks.
Send quantity, shell weight and logo placement. Reina replies within 24 hours with pricing and sampling options.